FAIL (the browser should render some flash content, not this).

Current Parking Garage Projects

IDG provides complete parking garage architectural planning and design of site and structured parking, for all types of commercial, retail, institutional, transportation and healthcare projects. Below are some of our current parking projects.

current parking projects

Winter.2010

Warner Center – Los Angeles, California
Details: 390-Stalls, cast-in-place, post-tensioned flat plate parking structure
Construction Cost: $5.5 Million
Client: Western National Realty Properties Contact: Taylor Grant, Vice President
Architect: Innovative Design Group
Structural Engineer: BPA Group, Inc.

Winter.2010

Cerano Apartments – Milpitas, California
Details: 756-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $11.2 Million
Client: Fairfield Residential
Contact:
Shawn Melendez
Architect: Innovative Design Group
Structural Engineer:
BPA Group, Inc.

Winter.2010

University House – Fullerton, California
Details: 1,368-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $18.72 Million
Client: Pyramid Builders
Contact:
Mike Murphy
Architect: Innovative Design Group
Structural Engineer:
BPA Group, Inc.

Winter.2010

BRE Pasadena – Pasadena, California
Details: 756-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $11.2 Million
Client: Fairfield Residential
Contact:
Shawn Melendez
Architect: Innovative Design Group
Structural Engineer: BPA Group, Inc.

Winter.2010

Monrovia Block 700 – Monrovia, California
Details:408-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $5.8 Million
Client: Urban Housing Group
Contact:
Daniel Deibel, Vice President of Development
Architect: Innovative Design Group
Structural Engineer:
Seneca Structural Engineering, Inc.

Winter.2010

Moran Gardens – Westminster, California
Details:1,000-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: TBD
Client: Covi Concrete Construction
Contact:
Paul Bissin
Architect: Innovative Design Group
Structural Engineer: Seneca Structural Engineering, Inc.

Winter.2010

St. Jude Phase II Medical Center Parking Structure – Fullerton, California
Details:8-levels, 550-Stalls cast-in-place concrete beam and slab post-tensioned parking structure
Construction Cost: TBD
Client: Saint Joseph Medical Center
Contact:
Bill Eveloff, Assistant Vice President
Architect: Innovative Design Group
Structural Engineer:
SBPA Group, Inc.
Contractor:
McCarthy Construction

Winter.2010

Western University – Pomona, California
Details:756-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $11.2 Million
Client: Fairfield Residential
Contact:
Shawn Melendez
Architect: Innovative Design Group
Structural Engineer: SBPA Group, Inc.
Contractor:
Bycor Construction

current parking projects

Winter.2010

Laurel & Kettner – San Diego, California
Details: 1,368-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: Estimated $5.2 Million
Client: Aladdin Developers
Contact: Tony Vincent, CEO
Architect: Innovative Design Group
Structural Engineer: BPA Group, Inc.
Design: Construction Documents

Winter.2010

Fox Plaza – Riverside, California
Details: 350-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $4.75 Million
Client: Metro Riverside, LLC
Contact:
Siavash Barmand, Principal
Architect: Innovative Design Group
Structural Engineer:
Seneca Structural Engineering, Inc.

Winter.2010

Kelvin Apartments – Irvine, California
Details:396-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $5.34 Million
Client: Trammel Crow Residential
Contact:
Alexander Gill Vice President of Development
Architect: Innovative Design Group
Structural Engineer: TBD

Winter.2010

Alton Millikan – Irvine, California
Details: 317-Stalls, cast-in-place, post-tensioned concrete flat plate parking structure
Construction Cost: $4.3 Million
Client: Trammel Crow Residential
Contact:
Alexander Gill Vice President of Development
Architect: Innovative Design Group
Structural Engineer: TBD

Winter.2010

Our Lady of Mount Carmel Church Newport Beach, California
Details:150-Stalls, cast-in-place, post-tensioned concrete flat plate
Construction Cost: $3.3 Million
Client: Slater Builders
Contact:
Bill Dunlap
Architect: Innovative Design Group
Structural Engineer:
Seneca Structural Engineering, Inc.

Winter.2010

LCMH Daily Breeze MOB Torrance, California
Details:4-Level, 451-stalls cast-in-place beam and slab post-tensioned parking structure
Construction Cost: $6 Million
Client: Pacific Medical Buildings, LP
Contact:
John Hussey, Senior Vice President
Architect: Innovative Design Group
Structural Engineer: TBD

Winter.2010

BRE Anaheim – Anaheim, California
Details:450-Stalls, cast-in-place flat plate post-tensioned system parking structure
Construction Cost: $6 Million
Client: BRE Properties
Contact:
Bob Linder Vice President of Development
Architect: Innovative Design Group
Structural Engineer:
Seneca Structural Engineering, Inc.

Winter.2010

Platinum Towers – Anaheim, California
Details:2,050-Stalls, cast-in-place, beam and slab post-tensioned parking structure
Construction Cost: $31 Million
Client: Swinerton Builders
Contact:
Mike Pulley, Director
Architect: Innovative Design Group
Structural Engineer: TBD